Executive Summary

A renewable-energy project positioned in Northeast Brazil

The source business-plan summary describes a 160 MW wind-energy complex proposed for the Ceará / Rio Grande do Norte region, with a broader expansion thesis and local engineering participation.

The financing case is presented around long-duration power sales, grid access, renewable-energy demand and a staged construction program.

02

Project Architecture

Core operating components

01

Land

Long-duration lease arrangements supporting the planned generation sites.

02

Generation

A projected annual output of approximately 594,216 MWh in the source plan.

03

PPA

A long-term power-purchase framework described in the source materials.

04

Grid

A dedicated transmission connection linking the project into Brazil’s national grid.

03

Capital Program

Funding and deployment

The source plan identifies total funding requirements of approximately USD 320 million and allocates capital across turbines, civil works, engineering, infrastructure, operations, land and contingency reserves.

  • Generation equipment and turbine systems
  • Construction and ancillary infrastructure
  • Engineering and technical systems
  • Maintenance, staffing and operating infrastructure
  • Contingency and execution reserves
04

Due Diligence

Documents that determine bankability

  • Wind-resource and technical studies
  • Environmental licenses
  • Land and lease agreements
  • Power-purchase documentation
  • Financial model and implementation schedule
“The project case is ultimately a question of verified resource quality, executable contracts, construction discipline and financing structure.”
View full recovered original publication

1.0 Executive Summary

Industry Overview:

Brazil’s energy market is robust, with hydropower dominating at over 60% of electricity supply, supplemented by thermal, wind, and solar sources. Government policies promote renewable energy, creating a competitive market for private companies.

Project Overview: 

The project involves developing a 160 MW wind energy complex in Brazil’s Ceará/Rio Grande do Norte region, with plans for broader expansion. It is a partnership with a Brazilian firm boasting 70 years of energy engineering experience.

Financing: 

Seeking $320 million to fund Project Icapui, a wind farm with a 20-year Power Purchase Agreement (PPA) with Tradener at a minimum $40/MWh (inflation-indexed).

2.0 Project Overview

Project Icapui: A 160 MW wind energy complex in Northeast Brazil, to be developed by a Brazilian entity established upon funding.

Key features include:

01

LAND

Secured via 30-year leases (renewable for another 30 years).

02

CAPACITY

594,216 MWh/year, with a capacity factor of 0.59 (P50).

03

PPA

20-year agreement with Tradener, with flexibility to sell to higher-paying buyers.

04

CONSTRACTION

24-month timeline, managed by an experienced Brazilian EPC firm with a 30-year track record and 1,600 MW delivered.

05

Grid Connection

10.12 km of 69 kV transmission line to the national grid.

06

Financials

Projected $1.348 billion in free cash flow over 30 years, with equipment rated for 45+ years (depreciated at 30 years).

07

Sustainability

Reduces CO2 emissions, supporting Brazil’s clean energy goals.

Location: Ceará/Rio Grande do Norte, known for favorable wind conditions, agricultural economy, and tourism (e.g., Jericoacoara National Park).

Two-Year Objectives:

  • Secure funding and contractors, complete construction on schedule.
  • Achieve full operational capacity and seamless energy delivery.
  • Establish a strong presence in Brazil’s renewable energy market.

Keys to Success:

  • Experienced management leveraging Brazilian government PPAs.
  • Partnership with a Brazilian firm for local expertise.
  • Global financing and talent acquisition capabilities.
  • Modern management tools for real-time oversight.
  • Strong ESG focus supporting local communities and sustainability.

Challenges: Reducing emissions and improving efficiency.

3.0 Industry OverviewBrazilian Energy Sector

01

SIZE


Valued at ~$103 billion in 2020, with hydropower ($23 billion), wind ($2.7 billion), and solar ($370 million).

02

GROWTH

Installed capacity grew from 118 GW (2011) to 173 GW (2020), with wind and solar CAGRs of 21.8% and 47.6%, respectively.

03

WIND ENERGY

Accounts for >10% of electricity, driven by Northeast winds, government programs (e.g., PROINFA), and a domestic turbine industry. Brazil ranks 6th globally, with >700 GW potential.

04

FUTURE

The 2027 Energy Expansion Plan targets 28% non-hydro renewables.

4.0 Competitor Analysis

Key players include:

CPFL Energias Renováveis:

GW (wind, solar, hydro).

Omega Geração: 

1.5 GW (wind, solar).

Casa dos Ventos:

5 GW pipeline (wind, solar).

Enel Green Power:

1 GW (wind, solar, hydro).

EDP Renováveis:

1.4 GW (wind, solar).

AES Tietê:

3 GW (hydro, wind, solar).


5.0 Project Plan

MILESTONES


Mobilization, land preparation, construction of roadways, offices, maintenance facilities, transmission lines, turbine foundations, microgrid, and turbines.

Operation and maintenance of the energy complex.

SCHEDULE


24-month construction timeline starting in Year 1.

TECHNICAL ASPECTS

TURBINES


16 Kohilo Cyclone Vertical Axis Turbines (8 MW each, 180 m hub height), bird/bat-friendly, low-noise, producing 594,216 MWh/year. Capable of generating electricity and hydrogen, with a cut-in speed of 1.5 m/s and cut-out at 56 m/s.

SUB-PARKS


Ventos de Icapui (9 turbines, 72 MW) and São Felício (7 turbines, 56 MW).

GRIND CONENCTION


34.5/69 kV substation, 10.12 km transmission line to Mossoró IV.

ENVIRONMENTAL PERMISSIONS


Licenses valid until August 2026.

MANAGEMENT


Entity: A Brazilian company to be established in Brasília, with a regional office in Mossoró.

Leadership:

Chairman: Executive with 29 years of global project management experience.

Vice Chairman: Retired Major General with sustainability and energy expertise.

CEO: Engineer with 70+ energy projects, including work with the World Bank and Brazil’s Ministry of Mines and Energy.

6.0 Investment Program and Costs

Two-Year Objectives:

  • Investment Program:
  • Total Funding Required: $320 million, structured as 100% debt at 4.5% interest (adjustable to other debt/equity ratios).
  • Use of Funds:
    • Cyclone Vertical Turbines: $169,000,000
    • Construction & Ancillary Items: $80,000,000
    • Project Engineering: $11,000,000
    • Technical and Business Infrastructure: $17,000,000
    • Maintenance & Inventory Facility: $2,338,000
    • Personnel Salaries: $1,470,000
    • Office Expenses: $480,000
    • Land Lease: $182,000
    • Social Actions: $130,000
    • Financial Consultant: $6,400,000
    • Contingency: $32,000,000
  • Financial Strategy: A 20-year PPA with Tradener ensures a minimum $40/MWh, with flexibility to sell at higher market prices. Tradener’s expertise in 500+ energy auctions enhances market access.
  • Financial Projections (30 years, 100% debt at 4.5%):


7.0 Closing Remarks

  • Project Icapui is a sustainable wind energy initiative contributing to Brazil’s clean energy goals. It leverages strategic location, advanced technology, experienced management, and strong financial projections to deliver clean electricity and foster a greener future.
  • Annexes
  • Wind Research Report
  • Environmental License Ventos de Icapui
  • Environmental License São Felício
  • Leasing Agreement Ventos de Icapui
  • Leasing Agreement São Felício
  • Project Icapui Financial Overview
  • Tradener PPA
[rmg_private_client_checkout]

✓
The Brazilian energy market is a vast and diverse sector, offering investment opportunities in both conventional and renewable energy sources. Hydropower is the primary source of electricity generation, accounting for over 60% of the country's total supply. The remaining electricity is generated by thermal power plants and renewable sources such as wind and solar. The Brazilian government has implemented policies to promote the growth of renewable energy sources, creating a competitive market that allows private companies to generate, transmit, and distribute electricity.

CONTACT US
Source & Editorial Note

This redesigned page preserves the subject, core figures and framework of the existing RMG publication while presenting it in the new RMG Insights editorial system. The original public URL is retained, and project or transaction claims remain subject to underlying documentation, verification and applicable due diligence.